(a) Separate sewers. Separate sewers shall be provided for collection of stormwater and wastewater. Roof, areaway, drive or foundation drains shall not be connected to sanitary sewers.
(b) Pipe materials. Types of commercial pipe approved for pressure sanitary sewer systems include:
(c) Collection piping design, construction and testing. A sewage collection line is any conduit that carries wastewater that originates from two (2) or more separate buildings or from a single building that generates more than 2,000 gpd (7.6 m3/d) of average daily flow.
Sewer Size Inch (cm) Minimum Slope in Feet Per 100 Feet (m/100 m) 6 (15.2) 0.60 8 (20.3) 0.40 10 (25.4) 0.28 12 (30.5) 0.22 14 (35.6) 0.17 15 (38.1) 0.15 16 (40.6) 0.14 18 (45.7) 0.12 20 (50.8) 0.11 21 (53.3) 0.10 24 (61.0) 0.08 27 (68.6) 0.067 30 (76.2) 0.058 33 (83.8) 0.051 36 (91.4) 0.046
Maximum slopes without the use of concrete anchors shall be 20 percent. The following spacing of concrete anchors shall apply to slopes greater than 20 percent:
Slopes (percent) | Concrete Anchor |
20-35 | 36 ft (11 m) |
35-50 | 24 ft (7.3 m) |
More than 50 | 16 ft (4.9 m) |
- (D) Velocity. Minimum velocities shall be 2 fps (0.6 mps) when flowing full. Velocities greater than 10 fps (3.0 mps) require special design considerations.
- (E) Increasing size. All sewer pipe size changes shall be at manholes. Pipe size shall not be decreased in the direction of flow. The energy gradient line should be maintained when a smaller sewer joins a larger one.
- (F) Excavation, bedding installation, backfill.
- (I) Excavation. Trench width from the trench bottom to a point one foot above the top of the pipe shall be no less than the outside diameter of the pipe plus 8 (8) inches (20.3 cm) but not more than twenty-four (24) inches (61 cm) plus the pipe O.D. The trench bottom shall be excavated for the pipe bell. All rock shall be removed within six (6) inches (15.2 cm) of pipe. The trench shall be dewatered for all work.
- (II) Bedding. Bedding shall be designed in accordance with:
- (1.) Rigid pipe. Types A, B, C (Water Pollution Control Federation Manual of Practice No. 9) or ASTM C12-81.
- (2.) Flexible pipe. Types I, II, III, ASTM D2321-74.
- (III) Backfill. Backfill shall be performed without disturbing pipe alignment. Backfill shall not contain debris, frozen material, unstable material, or large clods. Stones greater than three (3) inches (7.6 cm) in diameter shall not be placed within two (2) feet (0.6 m) of pipe. Compaction shall be to a density equal to or greater than the surrounding soil.
- (ii) Force mains and pressure sewers.
- (A) Depth. Force mains shall be located to protect them from freezing and frost heave.
- (B) Size. Force mains shall be four (4) inches (10 cm) diameter or greater. Pressure sewer collection system piping shall be one (1) inch (2.5 cm) minimum.
- (C) Velocity. Minimum velocity shall be 2.5 fps (0.76 mps).
- (D) Air release. Air release facilities shall be provided at the high point in the piping whenever the pipe crown elevation falls below the pipe invert elevation. Access to air release manholes shall not be in traffic-ways.
- (E) Cleanouts. Cleanouts shall be provided at 400-foot (122 m) maximum spacing in pressure piping four-inch diameter or less.
- (F) Pressure sewer systems. Pressure sewer collection systems shall be preceded by grinder pumps or septic tanks.
- (G) Pressure sewer collection system pumps. Pumps shall be provided with isolation and check valves. If a septic tank is not provided before the pump, a grinder pump shall be required. Pump holding sumps shall not be steel, iron, or coated metal. The sump chamber shall be fifty (50) gallon (189 liters) volume, minimum.
- (iii) Service connections. A service connection is any conduit that carries wastewater that is not defined as a sewage collection line. Service connections shall conform to the requirements for sewage collection lines (Section 9(c)(i) and (ii) ) with the following modifications:
- (A) Size: minimum size shall be four (4) inches (10.2 cm).
- (B) Slope: minimum slope shall be 2 feet/100 feet (2 m/100 m).
- (C) Flow: flow shall be determined from a fixture unit count and the sewage size based on flowing full.
- (D) Connections: all service connections to sewage collection lines shall be made with a wye or tee for new construction and a tapping saddle for connection to existing collection lines.
(d) Manholes and cleanouts.
Line Size (In) (cm) Maximum M.H. Spacing 15 or less (38 or less) 400 ft 122 m 16 - 30 (40.6 - 76) 500 ft 152 m 31 or more (78 or more) 600 ft 183 m
Terminal sewer cleanouts may be provided at the end of sewer lines if they are not more than 150 feet (45.7 m) from the nearest downstream manhole. The cleanout shall be constructed using 45-degree bends to the upturned pipe coming to the surface of the ground. The diameter of the cleanout shall be the same as the pipe size. Lampholes shall not be used.
- (ii) Size. Minimum manhole interior size is four (4) feet (1.2 m).
- (iii) Drop manhole. Drop manholes must be constructed where the change in elevation between two lines is greater than twenty-four (24) inches (0.6 m). Concrete encasement shall be provided around the drop pipe.
- (iv) Invert. Manhole inverts shall be constructed to conform to the shape of the sewer. The bench shall drain to the invert. Connections to the manhole shall be watertight and allow differential settlement between the manhole and pipe. Minimum fillet height shall be one half of the pipe diameter.
- (v) Cover. The manhole cover shall be suitable to withstand all loads, including impact loading without deformation, slip or rattle. The manhole cover shall be watertight in areas subject to flooding and a bolt-down type in areas subject to unauthorized dumping or vandals.
- (vi) Steps. Access to manholes shall be with portable ladders, or with cast iron manhole steps spaced at sixteen (16) inches (40.6 cm) maximum.
- (vii) Materials. Manholes shall be constructed watertight and durable using cast-in-place concrete, or precast concrete with gasketed joints. Where precast concrete bases are used, the first twelve (12) inches (30 cm) of wall will be monolithically cast with the base.
- (viii) Access. A twenty-two (22) inch (56 cm) minimum diameter clear opening shall be provided on all manholes. All manholes shall be located to be accessible by motorized equipment for maintenance.
(e) Special structures.
(f) Potable water supply protection.
020-11 Wyo. Code R. § 11-9
Amended, Eff. 6/29/2018.