(a) The Council shall either grant or deny the application as filed, or grant it upon terms, conditions or modifications of the construction, operation or maintenance of the industrial facility as the Council deems appropriate. The Decision of the Council shall be written and shall be effective the date it is signed by the chair of the Council.
(b) Compliance with all applicable law. The Council must find that the proposed industrial facility will comply with all applicable local, state, and federal law throughout each phase of planning, construction, and operation. The local and state laws that must be complied with for purposes of this subsection consist of those laws which were in force on the date of application. In many cases, required permits and approvals may not be applied for until subsequent to the filing of the application. Therefore, the Council will examine the list of permits that regulate other aspects of the facility development for the purpose of determining whether the proposed industrial facility would be in compliance with all applicable laws if the permits and approvals specified therein were issued as expected.
(c) Threat of serious injury. In order to find that the industrial facility does not pose a threat of serious injury, the Council must find that the granting of a permit, as conditioned by the Council, will not result in a significant detriment to, or significant impairment of, the environment or the social and economic condition of present or expected inhabitants.
(d) Substantially impair the health, safety or welfare. The Council must find that the proposed industrial facility will not substantially impair the health, safety or welfare of the present or expected inhabitants of the areas of site influence. A proposed industrial facility may be found to substantially impair the health, safety or welfare of the inhabitants if their health, safety or welfare during and after construction would be significantly diminished or weakened relative to present levels.
(e) If the Council is not able to find that these conditions are met, the Council shall deny the application.
(f) If the Council determines that the location of all or part of the proposed industrial facility should be modified, it may condition its permit upon that modification, provided that the local governments, and persons residing therein, affected by the modification, have been given reasonable notice of the modification.
(g) If the Council decides to grant a permit for the industrial facility, it shall issue the permit embodying the terms and conditions in detail, including the time specified to commence construction, which time shall be determined by the Council's decision as to the reasonable capability of the local government, most substantially affected by the proposed industrial facility, to implement the necessary procedures to alleviate the impact. If the construction of the facility fails to follow the schedule used by the Council to make its decision, the Council may require an amendment to the permit in accordance with W.S. 35-12-106(c) and (d).
(h) Unless the Council extends the permit as provided in subsection (i) of this section a permit to construct shall expire for any of the following conditions:
(i) The Council may extend the time periods of paragraphs (h)(i) and (h)(ii) above for good cause provided that the facility requests an extension in a timely manner accompanied by an update to the Application including the following:
(j) Permit Term. During the application for a permit or permit waiver, an applicant may request that the permit be issued for a term of less than the life of the facility, but not less than the construction phase(s). The Council may authorize a permit for a term less than the life of a facility if the applicant demonstrates that all of the following conditions exist:
(k) Local governments may make a request for a bond pursuant to W. S. 35-12-113(e), such requests must: