006-5 Wyo. Code R. § 5-4

Current through April 27, 2019
Section 5-4 - Uniform Standards for Assessing and Approving Agency Building and Other Space Needs

(a) Uniform standards for building and space needs are for planning purposes only; and are not intended to be regulatory/mandatory, i.e., agency compliance is not required:

  • (i) Space planning shall provide a maximum of approximately 100 square feet for clerical staff; a maximum of 125 square feet for support staff; a maximum of 150 square feet for management staff; and a maximum of approximately 200 square feet for directors.
  • (ii) Space shall meet Americans with Disabilities Act (ADA) requirements.
  • (iii) Space shall be asbestos free or abated.
  • (iv) Electrical service and conduit adequate for all necessary agency equipment, including communications room(s) and cable adequate to support both voice and data equipment requirements.
  • (v) Adequate parking.
  • (vi) Adequate heating ventilation, air conditioning and insulation.
  • (vi) Adequate exterior grounds maintenance systems.

(b) GSD shall assess agency building requirements/requests and other space needs, according to the following needs assessment procedures:

  • (i) GSD shall annually collect uniform data describing the condition of state buildings.
  • (ii) All agencies shall provide data describing the condition of state buildings, using the GSD generated "Initial Building Survey". Data shall be transmitted via computer whenever possible.
  • (iii) Agencies shall send Capital Outlay Construction requests, "Initial Building Survey(s) and capital outlay budget narrative(s) to GSD.
  • (iv) GSD shall cross-reference agency requests with survey data and verify reliability.

(c) GSD shall forecast building longevity and future agency space requirements based on information obtained from the needs assessment.

(d) Needs assessments shall be utilized in the prioritization of capital construction requests.

(e) Needs assessments shall be used to evaluate renovation needs for each state building. Information obtained from the "Building Survey" shall be used to determine if a cost/benefit analysis shall be conducted.

(f) Needs assessments shall specify construction and renovation requirements for a 5 year period. A prioritization of all statewide requests shall be developed by GSD each year. GSD shall generate a current fiscal year list of construction/renovation projects and a list of projects for the 4 succeeding years.

(g) On or before November 1st of each year and based upon the needs assessment, the SBC shall establish and prioritize construction, renovation and leasing needs. They shall identify and prioritize potential projects to be studied for inclusion in the Wyoming public buildings construction program. Construction and renovation needs shall be prioritized for the current fiscal year and each of the following 4 fiscal years.

(h) On or before December 1st of each year, the SBC shall provide this information to members of the legislature.

006-5 Wyo. Code R. § 5-4