Wis. Admin. Code Department of Natural Resources NR 274.075

Current through October 28, 2024
Section NR 274.075 - Pretreatment standards for existing sources

Except as provided in ss. NR 211.13 and 211.14, any existing source subject to this subchapter which introduces pollutants into a POTW shall comply with ch. NR 211 and achieve the following PSES:

Table 7-37

Primary Lead Sinter Plant Materials Handling Wet Air Pollution Control

PSES

Maximum for any 1 day

Maximum for monthly average

Pollutant or pollutant property

mg/kkg (pounds per billion pounds) of sinter production

Lead

100.800

46.800

Zinc

367.200

151.200

Table 7-38

Primary Lead Blast Furnace Wet Air Pollution Control

PSES

Maximum for any 1 day

Maximum for monthly average

Pollutant or pollutant property

mg/kkg (pounds per billion pounds) of blast furnace lead bullion produced

Lead

0.000

0.000

Zinc

0.000

0.000

Table 7-39

Primary Lead Blast Furnace Slag Granulation

PSES

Maximum for any 1 day

Maximum for monthly average

Pollutant or pollutant property

mg/kkg (pounds per billion pounds) of blast furnace lead bullion produced

Lead

0.000

0.000

Zinc

0.000

0.000

Table 7-40

Primary Lead Dross Reverberatory Slag Granulation

PSES

Maximum for any 1 day

Maximum for monthly average

Pollutant or pollutant property

mg/kkg (pounds per billion pounds) of slag, speiss, or matte granulated

Lead

1,612.000

748.400

Zinc

5,872.000

2,418.000

Table 7-41

Primary Lead Dross Reverberatory Furnace Wet Air Pollution Control

PSES

Maximum for any 1 day

Maximum for monthly average

Pollutant or pollutant property

mg/kkg (pounds per billion pounds) of dross reverberatory furnace production

Lead

0.000

0.000

Zinc

0.000

0.000

Table 7-42

Primary Lead Zinc Fuming Wet Air Pollution Control

PSES

Maximum for any 1 day

Maximum for monthly average

Pollutant or pollutant property

mg/kkg (pounds per billion pounds) of blast furnace lead bullion produced

Lead

0.000

0.000

Zinc

0.000

0.000

Table 7-43

Primary Lead Hard Lead Refining Slag Granulation

PSES

Maximum for any 1 day

Maximum for monthly average

Pollutant or pollutant property

mg/kkg (pounds per billion pounds) of hard lead produced

Lead

0.000

0.000

Zinc

0.000

0.000

Table 7-44

Primary Lead Hard Lead Refining Wet Air Pollution Control

PSES

Maximum for any 1 day

Maximum for monthly average

Pollutant or pollutant property

mg/kkg (pounds per billion pounds) of hard lead produced

Lead

0.000

0.000

Zinc

0.000

0.000

Table 7-45

Primary Lead Facility Washdown

PSES

Maximum for any 1 day

Maximum for monthly average

Pollutant or pollutant property

mg/kkg (pounds per billion pounds) of lead bullion produced

Lead

0.000

0.000

Zinc

0.000

0.000

Table 7-46

Primary Lead Employe Handwash

PSES

Maximum for any 1 day

Maximum for monthly average

Pollutant or pollutant property

mg/kkg (pounds per billion pounds) of lead bullion produced

Lead

0.924

0.429

Zinc

3.366

1.386

Table 7-47

Primary Lead Respirator Wash

PSES

Maximum for any 1 day

Maximum for monthly average

Pollutant or pollutant property

mg/kkg (pounds per billion pounds) of lead bullion produced

Lead

1.484

0.689

Zinc

5.406

2.226

Table 7-48

Primary Lead Laundering of Uniforms

PSES

Maximum for any 1 day

Maximum for monthly average

Pollutant or pollutant property

mg/kkg (pounds per billion pounds) of lead bullion produced

Lead

4.340

2.015

Zinc

15.810

6.510

Wis. Admin. Code Department of Natural Resources NR 274.075

Cr. Register, March, 1991, No. 423, eff. 4-1-91.