Current through October 28, 2024
Section NR 216.49 - Conformance with other applicable regulations(1) LOCAL COMPLIANCE. The erosion control and storm water management plans shall document other applicable municipal regulatory provisions, compliance with which will also meet the requirements of the permit. If these municipal provisions are more stringent than those provisions appearing in a permit issued pursuant to this subchapter, the erosion control and storm water management plans shall include a description of how compliance with the municipal provisions will be achieved.(2) PLUMBING REGULATIONS. The erosion control and storm water plans shall be in compliance with applicable state plumbing regulations. Note: Plumbing regulations are contained within chs. SPS 381 to 387.
(3) IMPAIRED WATERS. For any of the receiving waters designated as an impaired water, the erosion control plan required under s. NR 216.46 and the storm water management plan required under s. NR 216.47 shall contain a written assessment of the potential for storm water from the facility to discharge a pollutant of concern and identify the control measures and maintenance practices that will collectively be used to reduce, with the goal of eliminating, storm water discharge containing pollutants of concern.(4) TMDL. If the permittee is subject to an US EPA-approved TMDL, the erosion control plan required under s. NR 216.46 and the storm water management plan required under s. NR 216.47 shall specify the pollution prevention and treatment systems that will be employed to achieve the TMDL permit requirements.Wis. Admin. Code Department of Natural Resources NR 216.49
CR 03-028: cr. Register July 2004 No. 583, eff. 8-1-04.Amended by, CR 21-027: cr. (3), (4) Register March 2022 No. 795, eff. 4/1/2022 Plumbing regulations are contained within chs. SPS 381 to 387.