Effluent limitations for point sources discharging BOD5 to the Peshtigo river shall be calculated according to the procedures contained in this section. These limitations shall apply from May 1 to October 31 annually.
Baseline load = (Q) (8.34) (60) + (BPT) (Production)
Where Q = The year 2000 flow projection of the domestic contribution of the influent to the treatment plant expressed in millions of gallons per day
8.34 = Conversion factor
60 = Concentration of BOD 5 expressed in milligrams per liter
BPT = The final best practicable waste treatment effluent limitations for the industrial contribution of the influent to the treatment plant as provided in ch. NR 284 expressed as pounds of BOD5 per ton of production. If ch. NR 284 does not apply, the best practicable waste treatment effluent limitations as determined under ch. NR 220 shall apply.
Production = The annual average off-machine production during January 1 to December 1, 1978 expressed as tons per day
Baseline load = (BPT) (Production)
Where BPT = The final best practicable waste treatment effluent limitations for the point source which is not discharged to a publicly-owned treatment system as provided in ch. NR 284 expressed as pounds of BOD5 per ton of production. If ch. NR 284 does not apply, the best practicable waste treatment effluent limitations as determined under ch. NR 220 shall apply.
Production = The annual average off-machine production during January 1 to December 1, 1978 expressed as tons per day.
Wis. Admin. Code Department of Natural Resources NR 212.70