Effluent limitations for point sources discharging BOD5 to the lower Fox river shall be calculated according to the procedures contained in this section. These limitations shall apply from May 1 to October 31 annually.
Baseline Load = (Q) (8.34) (60)
Where: Q
The average daily flow for the publicly- owned point source during 1976 and 1977 expressed in million gallons per day, computed as: 12.09 million gallons per day for the publicly-owned point source located between milepoints 38.0 and 37.0 on the Menasha channel.
1.40 million gallons per day for the publicly-owned point source located between milepoints 36.0 and 35.0.
10.47 million gallons per day for the publicly-owned point source located between milepoints 30.0 and 25.0.
2.99 million gallons per day for the publicly-owned point source located between milepoints 23.0 and 22.0.
8.34 = Conversion factor (lbs./gal.).
60 = Concentration of BOD 5 expressed in milligrams per liter.
Baseline Load = (Q) (8.34) (60)
Where: Q = The average daily flow for the publicly- owned point source during 1979 expressed in millions of gallons per day, computed as:
3.96 million gallons per day for the publicly-owned point source located between milepoints 7.0 and 6.0.
19.03 million gallons per day for the publicly-owned point source located between milepoints 1.0 and 0.0.
8.34 = Conversion factor (lbs./gal.).
60 = Concentration of BOD 5 expressed in milligrams per liter.
Baseline Load = (BPT) (Production) (0.85)
Where: BPT = The final best practicable waste treatment effluent limitations for the point source as provided in ch. NR 284 or 220, when applicable, expressed in pounds of BOD5 per ton of production.
Production = The maximum weekly off-machine production during 1973 expressed as tons per day.
0.85 = Adjustment factor to approximate daily average off-machine production.
Baseline Load = (BPT) (Production)
Where: BPT = The final best practicable waste treatment effluent limitations for the point source as provided in ch. NR 284 or 220, when applicable, expressed in pounds of BOD5 per ton of production
Production = 1977 average daily off-machine production.
Reserve Capacity = (P) (124) (8.34) (60)
Where: P = Projected population change for the area between the years 1977 and 2000 expressed in millions of persons.
124 = Projected per-capita waste water flow expressed in gallons per day.
8.34 = Conversion factor (lbs./gal.).
60 = Concentration of BOD 5 expressed in milligrams per liter.
Reserve Capacity = (P) (1 10) (8.34) (60)
Where: P = Projected population change for the area between the years 1979 and 2000 expressed in millions of people
110 = Projected per-capita wastewater flow expressed in gallons per day.
8.34 = Conversion factor (lbs./gal.).
60 = Concentration of BOD 5 expressed in milligrams per liter.
Reserve Capacity = (P) (1 11) (8.34) (60)
Where: P = Projected population change for the area between the years 1979 and 2000 expressed in millions of people.
11 1 = Projected per-capita wastewater flow expressed in gallons per day.
8.34 = Conversion factor (lbs./gal.).
60 = Concentration of BOD 5 expressed in milligrams per liter.
Adjusted Baseline Load = (BL) - ( BL) x (Total Reserve Capacity)
Total BL
Where: BL = The baseline load for the nonpublicly-owned point source as deter - mined using the procedures in sub. (2) (b) and (c)
Total BL = The sum of all the baseline loads for nonpublicly-owned point sources calculated in sub. (2) (b) and (c) within the applicable stream segment defined in sub. (1)
Total Reserve Capacity= The sum of all the reserve capacities for publicly-owned point sources calculated in sub. (3) within the applicable stream segment defined in sub. (1).
Milepoint | BOD 5 Increment (lb/day) |
32.4 - 30.0 | 591 |
30.0 - 28.0 | 1619 |
28.0 - 26.0 | 3085 |
26.0 - 23.0 | 1710 |
23.0 - 22.7 | 565 |
22.7 - 22.5 | 2629 |
Point Source Allocation = (Adjusted Baseline Load) (T) C+D
Where: Adjusted
Baseline Load = The adjusted baseline load for the point source calculated in sub. (4)
T = The applicable total maximum daily BOD 5 load available for allocation as shown in sub. (1)
C = The sum of all the adjusted baseline loads within the applicable stream segment as defined in sub. (1) for publicly-owned point sources calculated in sub. (4) (a).
D = The sum of all the adjusted baseline loads within the applicable stream segment defined in sub. (1) for nonpublicly- owned point sources calculated in sub. (4) (b)
Wis. Admin. Code Department of Natural Resources NR 212.40