Wis. Admin. Code Department of Natural Resources NR 507.25

Current through November 25, 2024
Section NR 507.25 - Other monitoring

If the facility has the potential to cause environmental pollution as defined in s. 299.01(4), Stats., the department may require the owner or operator to monitor any or all of the following: landfill settlement; berm, sideslope and final cover stability; vegetative growth; drainage control structures; gradient control systems; and any other aspects of facility operation. All required monitoring shall be done in accordance with plans approved by the department. The department may require geophysical investigations to complement groundwater monitoring efforts.

Wis. Admin. Code Department of Natural Resources NR 507.25

Cr. Register, June, 1996, No. 486, eff. 7-1-96.