Current through November 25, 2024
Section NR 506.05 - Daily cover requirements(1) MUNICIPAL SOLID WASTE. All solid waste disposed in a municipal solid waste landfill shall be compacted and completely covered at the end of each operating day with a compacted layer of at least 6 inches of soil. Alternate daily cover materials may be approved or mandated by the department as required in s. NR 506.055. If clay soil is used for daily cover purposes, it shall be scarified or removed prior to placement of the next lift of solid waste.(2) INDUSTRIAL AND COMMERCIAL WASTE. Unless otherwise specified by the department, high volume industrial waste is not subject to daily cover requirements, unless disposed of in a municipal solid waste landfill. All other industrial waste and commercial waste shall be compacted and completely covered at the end of each operating day with a compacted layer of at least 6 inches of soil or other material approved in writing by the department. The department may grant an exemption in writing for less frequent covering. In granting such exemptions, the department shall consider the characteristics of the solid waste, the leaching potential of the solid waste and the potential for nuisance conditions if other than daily covering is utilized.Wis. Admin. Code Department of Natural Resources NR 506.05
Cr. Register, January, 1988, No. 385, eff. 2-6-88; r. and recr. (1), am. (2), Register, June, 1996, No. 486, eff. 7-1-96.