Current through November 25, 2024
Section NR 670.024 - Specific feasibility and plan of operation report information requirements for process vents Except as otherwise provided in s. NR 664.0001, owners and operators of facilities that have process vents to which subch. AA of ch. NR 664 applies shall provide all of the following additional information:
(1) For facilities that cannot install a closed-vent system and control device to comply with subch. AA of ch. NR 664 on the effective date that the facility becomes subject to subch. AA of ch. NR 664 or subch. AA of ch. NR 665, an implementation schedule as specified in s. NR 664.1033(1) (b).(2) Documentation of compliance with the process vent standards in s. NR 664.1032, including all of the following: (a) Information and data identifying all affected process vents, annual throughput and operating hours of each affected unit, estimated emission rates for each affected vent and for the overall facility (i.e., the total emissions for all affected vents at the facility), and the approximate location within the facility of each affected unit (e.g., identify the hazardous waste management units on a facility plot plan).(b) Information and data supporting estimates of vent emissions and emission reduction achieved by add-on control devices based on engineering calculations or source tests. For the purpose of determining compliance, estimates of vent emissions and emission reductions shall be made using operating parameter values (e.g., temperatures, flow rates or concentrations) that represent the conditions that exist when the waste management unit is operating at the highest load or capacity level reasonably expected to occur.(c) Information and data used to determine whether or not a process vent is subject to s. NR 664.1032.(3) Where an owner or operator applies for permission to use a control device other than a thermal vapor incinerator, catalytic vapor incinerator, flare, boiler, process heater, condenser or carbon adsorption system to comply with s. NR 664.1032, and chooses to use test data to determine the organic removal efficiency or the total organic compound concentration achieved by the control device, a performance test plan as specified in s. NR 664.1035(2) (c).(4) Documentation of compliance with s. NR 664.1033, including all of the following: (a) A list of all information references and sources used in preparing the documentation.(b) Records, including the dates, of each compliance test required by s. NR 664.1033(11).(c) A design analysis, specifications, drawings, schematics and piping and instrumentation diagrams based on the appropriate sections of APTI Course 415: Control of Gaseous Emissions, incorporated by reference in s. NR 660.11, or other engineering texts acceptable to the department that present basic control device design information. The design analysis shall address the vent stream characteristics and control device operation parameters as specified in s. NR 664.1035(2) (d) 3.(d) A statement signed and dated by the owner or operator certifying that the operating parameters used in the design analysis reasonably represent the conditions that exist when the hazardous waste management unit is or would be operating at the highest load or capacity level reasonably expected to occur.(e) A statement signed and dated by the owner or operator certifying that the control device is designed to operate at an efficiency of 95 weight % or greater unless the total organic emission limits of s. NR 664.1032(1) for affected process vents at the facility can be attained by a control device involving vapor recovery at an efficiency less than 95 weight %.Wis. Admin. Code Department of Natural Resources NR 670.024
CR 05-032: cr. Register July 2006 No. 607, eff. 8-1-06; correction in (1) made under s. 13.92(4) (b) 7, Stats., Register March 2013 No. 687.Amended by, CR 16-007: am. (4) (c) Register July 2017 No. 739, eff.8/1/2017