Current through October 28, 2024
Section NR 664.0302 - Action leakage rate(1) The department shall approve an action leakage rate for landfill units subject to s. NR 664.0301(3) or (4). The action leakage rate is the maximum design flow rate that the leak detection system can remove without the fluid head on the bottom liner exceeding one foot. The action leakage rate shall include an adequate safety margin to allow for uncertainties in the design (e.g., slope, hydraulic conductivity, thickness of drainage material), construction, operation and location of the leak detection system, waste and leachate characteristics, likelihood and amounts of other sources of liquids in the leak detection system and proposed response actions (e.g., the action leakage rate shall consider decreases in the flow capacity of the system over time resulting from siltation and clogging, rib layover and creep of synthetic components of the system, overburden pressures, etc.).(2) To determine if the action leakage rate has been exceeded, the owner or operator shall convert the weekly or monthly flow rate from the monitoring data obtained under s. NR 664.0303(3), to an average daily flow rate (gallons per acre per day) for each sump. Unless the department approves a different calculation, the average daily flow rate for each sump shall be calculated weekly during the active life and closure period, and monthly during the long-term care period when monthly monitoring is required under s. NR 664.0303(3).Wis. Admin. Code Department of Natural Resources NR 664.0302
CR 05-032: cr. Register July 2006 No. 607, eff. 8-1-06.