Current through November 25, 2024
Section NR 661.1060 - Standards: closed-vent systems and control devices(1) A remanufacturer or other person that stores or treats the hazardous secondary material in a hazardous secondary material management unit using closed-vent systems and control devices subject to this subchapter shall comply with s. NR 661.1033.(2)(a) A remanufacturer or other person that stores or treats the hazardous secondary material at an existing facility who cannot install a closed-vent system and control device to comply with the provisions of this subchapter on the effective date that the facility becomes subject to the provisions of this subchapter shall prepare an implementation schedule that includes dates by which the closed-vent system and control device will be installed and in operation. The controls shall be installed as soon as possible, but the implementation schedule may allow up to 30 months after the effective date that the facility becomes subject to this subchapter for installation and startup.(b) Any unit that begins operation after July 13, 2015, and is subject to the provisions of this subchapter when operation begins, shall comply with the rules immediately. The 30-month implementation schedule does not apply.(c) The remanufacturer or other person that stores or treats the hazardous secondary material at any facility in existence on the effective date of a statutory or regulatory amendment that renders the facility subject to this subchapter shall comply with all requirements of this subchapter as soon as practicable but no later than 30 months after the amendment's effective date. When control equipment required by this subchapter cannot be installed and begin operation by the effective date of the amendment, the facility owner or operator shall prepare an implementation schedule that includes specific calendar dates for award of contracts or issuance of purchase orders for the control equipment, initiation of on-site installation of the control equipment, completion of the control equipment installation, and performance of any testing to demonstrate that the installed equipment meets the applicable standards of this subchapter. The remanufacturer or other person that stores or treats the hazardous secondary material shall keep a copy of the implementation schedule at the facility.(d) A remanufacturer or other person that stores or treats the hazardous secondary material at facilities and units that become newly subject to the requirements of this subchapter after January 13, 2015, due to an action other than those described in par. (c) shall comply with all applicable requirements immediately.Wis. Admin. Code Department of Natural Resources NR 661.1060
Adopted by, CR 19-082: cr. Register August 2020 No. 776, eff. 9-1-20; correction in (2) (b) made under s. 35.17, Stats., Register August 2020 No. 776, eff. 9/1/2020