Current through November 25, 2024
Section NR 193.52 - General requirements(1) APPLICABILITY. Healthy Lakes and Rivers projects, shoreland protection projects, in-water management projects, wetland restoration projects, and wetland restoration incentives outlined in s. NR 193.51(1) and (2) shall occur in one or more of the following locations: (a) Within 1,000 feet of the ordinary high water mark of a lake.(b) Within 300 feet of a river or to the landward side of the flood plain, whichever distance is greater.(c) Within a wetland that is part of an aquatic ecosystem.(2) PROJECT DESIGN PLAN. In addition to the application elements specified in subch. I, applications for a grant for a shoreland protection project, in-water management project, or wetland restoration project outlined in s. NR 193.51(1) (b) to (d) shall be submitted with a project design plan that includes the following elements to be considered during application review and ranking: (a) A project implementation timeline and a site map. Projects requiring design and engineering shall submit one or more additional supporting documents, including schematics, site plans, monitoring plan, monitoring schedule, landscape design, or vegetation planting lists.(b) A maintenance plan describing how the project will be managed to maintain its conservation value.(3) CONTROL OF PROPERTY. Unless the property is owned by the state, the grantee shall have control of the property, through ownership, easements, deed restrictions, or contracts such that the sites being restored with grant funds awarded under s. NR 193.51(1) (b) to (d), and s. NR 193.51(2) and (3) remain in conservation use for 20 years.Wis. Admin. Code Department of Natural Resources NR 193.52
Adopted by, CR 19-078: cr. Register May 2020 No. 773, eff. 6-1-20; correction in (1) (b), (2) (intro.), (3) made under s. 35.17, Stats., Register May 2020 No. 773, eff. 6/1/2020