Wis. Admin. Code Department of Natural Resources NR 151.248

Current through October 28, 2024
Section NR 151.248 - Timing

The BMPs that are required under ss. NR 151.242 to 151.246 and 151.249 shall be installed before the construction site has undergone final stabilization.

Wis. Admin. Code Department of Natural Resources NR 151.248

CR 09-112: cr. Register December 2010 No. 660, eff. 1-1-11.
Amended by, correction in (Note) made under s. 13.92(4) (b) 7, Stats., Register November 2018 No. 755, eff. 12/1/2018

In accordance with subch. V, the department has developed technical standards to help meet the post-construction performance standards. These technical standards are available from the department at dnr.wi.gov.