Wis. Admin. Code Department of Natural Resources NR 135.09

Current through October 28, 2024
Section NR 135.09 - Topsoil management
(1) REMOVAL. Topsoil and topsoil substitute material shall be provided as specified in the reclamation plan in order to achieve reclamation to the approved post-mining land use. Removal of on-site topsoil and topsoil substitute material removal, when specified in the reclamation plan, shall be performed prior to any mining activity associated with any specific phase of the mining operation.
(2) VOLUME. The operator shall obtain the volume of soil required to perform final reclamation by removal of on-site topsoil or topsoil substitute material or by obtaining topsoil or substitute material as needed to make up the volume of topsoil as specified in the reclamation plan.

Note: Existing resources that may be used to identify the soil present on a site include the County Soil Surveys and information obtained from a soil scientist or the University of Wisconsin Soil Science Extension Agent or other available resources. Topsoil or topsoil substitute material shall be removed from areas to be affected by mining operations to the depth indicated in the reclamation plan or as determined in the field by a soil scientist, project engineer or other qualified professional.

(3) STORAGE. Once removed, topsoil or topsoil substitute material shall, as required by the reclamation plan, either be used in contemporaneous reclamation or stored in an environmentally acceptable manner. The location of stockpiled topsoil or topsoil substitute material shall be chosen to protect the material from erosion or further disturbance or contamination. Runoff water shall be diverted around all locations in which topsoil or topsoil substitute material is stockpiled.

Wis. Admin. Code Department of Natural Resources NR 135.09

Cr. Register, September, 2000, No. 537, eff. 12-1-00; CR 06-024: am. (1) Register November 2006 No. 611, eff. 12-1-06.