Wis. Admin. Code Department of Natural Resources NR 126.09

Current through November 25, 2024
Section NR 126.09 - Priority determination

The total of priority points shall be the sum of the applicable points for items in subs. (1) and (2) and the sum of points for each column in sub. (3).

POINTS

(1) STATUS OF PLANNING AND ENGINEERING.
(a) Final detailed approvable construction project plans and specifications received by the department prior to June 30, 1974.

100

(b) Final detailed approvable construction project plans and specifications received by the department after June 29, 1974.

70

(2) PUBLIC HEALTH HAZARD AND ADEQUACY OF EXISTING WATER POLLUTION ABATEMENT SYSTEM.
(a) A project for a municipality without a public sanitary sewage collection system and without a public water supply system to provide a sanitary sewer system and a sewage treatment plant, or a sanitary sewer system to be served by an existing or proposed sewage treatment plant owned by another municipality.

60

(b) A project in a municipality without a public sanitary sewage collection system but that has a public water supply system to provide a sanitary sewer system and a sewage treatment plant, or a sanitary sewer system to be served by an existing or proposed sewage treatment plant owned by another municipality.

50

(c) A project to provide secondary treatment for a municipality with only a primary sewage treatment plant.

40

(d) A project to provide adequate sewage treatment for a municipality with an inadequate secondary sewage treatment plant.

30

(e) A project to provide sewer extensions in a municipality that has a public sanitary sewer system.

20

(f) Intercepting sewers, force mains and pump stations shall receive the same number of points as the project of which they are a part.
(3) FINANCIAL NEED. Financial ability of the municipality shall be the sum of points of each column.

Points Applicable to Each Column

*Per Capita Income, Percent of State Average

Project Cost Dollars Per Capita Based on Current Population

*Local Share of Project Cost Plus Current

Long Term Non School Indebtedness As A

Percent of Statutory Limitation Based on

Equalized Valuation

1

Over 135%

$1 - 200

Less than 10%

2

100 to less than 135

201 - 400

10% to less than 20%

3

89 to less than 100

401 - 600

20% to less than 30%

4

80 to less than 89

601 - 800

30% to less than 40%

5

72 to less than 80

801 - 1,000

40% to less than 50%

6

65 to less than 72

1,001 - 1,200

50% to less than 60%

7

59 to less than 65

1,201 - 1,400

60% to less than 70%

8

54 to less than 59

1,401 - 1,600

70% to less than 80%

9

50 to less than 54

1,601 - 1,800

80% to less than 90%

10

Less than 50

Over 1,800

90% to less than 100%

*Based on the most recent department of revenue publications, "Long Term Indebtedness of Wisconsin Political Subdivisions" and "Taxes, Aids and Shared Taxes" and confirmation of its applicability by department investigation.

(4) PROJECT PRIORITY. Projects shall be rated for priority for grants in descending order of the sum of the points (maximum possible points: 200). In case of a tie in the priority ranking, the project with final detailed approvable construction plans received at the earlier date shall be given the higher rating.

Wis. Admin. Code Department of Natural Resources NR 126.09

Cr. Register, March, 1975, No. 231, eff. 4-1-75.