Current through November 25, 2024
Section NR 466.12 - Reporting requirements(1) Except as provided in this section, reporting requirements of ch. NR 460 apply to owners and operators of affected sources subject to this chapter as indicated in ch. NR 460 Appendix KK.(2) Each owner or operator of an affected source subject to this chapter shall submit the following reports to the department:(a) An initial notification as required in s. NR 460.08(2). 1. Initial notifications for existing sources shall have been submitted no later than June 1, 1998.2. Initial notifications for new MACT sources and reconstructed sources shall be submitted as required in s. NR 460.08(2).3. For the purpose of this chapter, a permit application for approval of construction or reconstruction under ch. NR 406 may be used in lieu of the initial notification required under s. NR 460.08(2), provided the same information is contained in the permit application as required by s. NR 460.08(2).4. Permit applications shall be submitted by the same due dates as those specified for the initial notifications.(b) A notification of performance tests as specified in ss. NR 460.06 and 460.08(5). This notification, and the site-specific test plan required under s. NR 460.06(2), shall identify the operating parameter to be monitored to ensure that the capture efficiency measured during the performance test is maintained. The operating parameter identified in the site-specific test plan shall be considered to be approved unless explicitly disapproved, or unless comments received from the department require monitoring of an alternate parameter.(c) A notification of compliance status as specified in s. NR 460.08(8).(d) Performance test reports as specified in s. NR 460.09(4) (b).(e) Startup, shutdown and malfunction reports as specified in s. NR 460.09(4) (e), but only if a control device is used to comply with this chapter. 1. If actions taken by an owner or operator during a startup, shutdown or malfunction of an affected source, including actions taken to correct a malfunction, are not completely consistent with the procedures specified in the source's startup, shutdown and malfunction plan as specified in s. NR 460.05(4) (c), the owner or operator shall state the information in the report. The startup, shutdown or malfunction report shall consist of a letter containing the name, title and signature of the responsible official who is certifying its accuracy, that shall be submitted to the department.2. Separate startup, shutdown or malfunction reports are not required if the information is included in the report specified in par. (f).(f) A summary report shall be submitted in accordance with s. NR 460.09(5) (c). In addition to a report of operating parameter exceedances as required by s. NR 460.09(5) (c) 1., the summary report shall include the following, as applicable:1. Exceedances of the standards in ss. NR 466.06 and 466.07.2. Exceedances of either of the criteria in s. NR 466.01(1) (a) 2. a. or b.3. Exceedances of the criterion in s. NR 466.015(3) (a) and (b) in the same month.4. Exceedances of the criterion ofWis. Admin. Code Department of Natural Resources NR 466.12
Cr. Register, March, 2000, No. 531, eff. 4-1-00.