Wis. Admin. Code Department of Natural Resources NR 432.03

Current through October 28, 2024
Section NR 432.03 - CAIR NOx allowance allocation

The department shall use the procedures in this section for calculating and allocating CAIR NOx allowances for CAIR NOx units and CAIR renewable units.

(1) UNIT BASELINES.
(a) Calculating baseline energy output. The department shall calculate the baseline energy output of each CAIR NOx unit and each CAIR renewable unit, in MWh according to the following equations as appropriate:
1. For a CAIR NOx unit that is a cogeneration unit and that has operated for 5 or more consecutive calendar years, by using one of the following equations:
a. Use equation 1a if the unit is the only unit serving a generator or, if more than one unit serves the same generator and unit-level data for equation 1a is available for all units:

See PDF for diagram

where:

B is the unit baseline energy output made available by the cogeneration unit in MWh

GEavg is the average of the 3 highest annual amounts of the unit's annual gross electric output in MWh over the 5-year period identified in par. (b)

TEavg is the average of the 3 highest annual amounts of the unit's annual useful thermal energy in mmBtu over the 5-year period identified in par. (b)

3.4 is a conversion factor in mmBtu/MWh

b. Use equation 1b if more than one unit serves the same generator and unit-level data for equation 1a is not available for all units:

See PDF for diagram

where:

Bi is the baseline energy output made available by cogeneration unit i in MWh

GEGen is the average of the 3 highest annual amounts of the annual gross electric output in MWh for the generator served over the 5-year period identified in par. (b)

TET is the average of the 3 highest annual amounts of annual useful thermal energy in mmBtu for the generator served over the 5-year period defined in par. (b)

3.4 is a conversion factor in mmBtu/MWh

NCi is the nameplate capacity of unit i

n is the number of units serving the same generator

2. For a CAIRNOx unit that is not a cogeneration unit and that has operated for 5 or more consecutive calendar years and for a CAIR renewable unit that has operated for 5 or more consecutive calendar years, by using one of the following equations as appropriate:
a. Use equation 2a if the unit is the only unit serving a generator or, if more than one unit serves the same generator and unit-level data for equation 2a is available for all units:

See PDF for diagram

where:

B is the unit baseline energy output made available by the CAIR NOx unit or the CAIR renewable unit in MWh

GEavg is the average of the 3 highest annual amounts of the unit's annual gross electric output in MWh over the 5-year period identified in par. (b)

b. Use equation 2b if more than one unit serves the same generator and unit-level data for equation 2a is not available for all units:

See PDF for diagram

where:

Bi is the baseline energy output made available by CAIR NOx unit i or CAIR renewable unit i in MWh

GEGen is the average of the 3 highest annual amounts of the annual gross electric output in MWh for the generator served over the 5-year period identified in par. (b)

NCi is the nameplate capacity of unit i

n is the number of units serving the same generator

(b)Periodic updates of baseline energy output for units with more than 5 years operating data. The department shall use the procedures in this paragraph for calculating the unit baseline energy output for each CAIR NOx unit or CAIR renewable unit which has more than 5 years of operating data.
1. In 2007, the department shall calculate the baseline energy output for each CAIR NOx unit for 2009 to 2014 allowances using data for the years 2000 to 2004.
2. On or before May 1, 2011, and on or before May 1 of every fifth year thereafter, the department shall calculate the baseline energy output for each CAIR NOx unit and each CAIR renewable unit for the next 5 year allocation period using data from the 5 calendar year period beginning 9 years before the first year of the allocation period and ending 5 years before the first year of the allocation period.

Note: For example in 2021, unit baseline energy output for the calculation of allocation for 2025 to 2029 allowances will be calculated using data from the years 2016 to 2020. In 2026, unit baseline energy output for the calculation of the allocation for 2030 to 2034 will be calculated using data from 2021 to 2025.

(c)Baseline energy output for new units and units achieving 5 years of operating data for the first time. The department shall use the procedures in this paragraph for calculating the unit baseline energy output for each CAIR NOx unit or CAIR renewable unit which have only 5 years of operating data.
1. On or before May 1, 2011, the department shall calculate the baseline energy output for each CAIR NOx unit and each CAIR renewable unit that commences operation on or after January 1, 2001 and that has operating data for the years 2006 to 2010 for 2015 to 2019 allowances using data for years 2006 to 2010.
2. On or before May 1, 2012, and on or before May 1 of every year thereafter, the department shall calculate the unit baseline energy output for each CAIR NOx unit and each CAIR renewable unit that has been operating for its first 5 consecutive years, using the first 5 years of operating data. Once the unit's baseline energy output has been established, the CAIR NOx unit or CAIR renewable unit's baseline energy output shall be updated according to par. (b).

Note: Starting in 2011, and every year thereafter, new units that commence operation on or after January 1, 2001 will have their unit baseline energy output calculated once the unit has 5 consecutive years of operating data. The 5 years of data do not have to be full years of data. Once the unit has 5 or more years of operating data, this unit is then incorporated into the state baselines calculated in s. NR 432.03(1m) and receives allocations from the main allocation pool under s. NR 432.03(2). These new units are incorporated into the main allocation pool on a yearly basis.

(d) Baseline energy output for retired units. If a unit is retired in any year, the department shall calculate the baseline energy output according to par. (b). If a unit only operates a portion of the year, the data for that portion shall constitute the unit's data for that year.

Note: The following is an example of how a retired unit's baseline energy output is calculated. A unit is retired in 2011. In 2011, unit baselines are updated using 2006 to 2010 annual data that will be used to calculate allocations for 2015 to 2019. For 2015 to 2019 allocations, the retired unit would receive all allowances based upon its unit baseline for 2006 to 2010 operating data even though it is no longer operating. In 2016, the next unit baseline updating year, the baseline for the unit would be determined using the most recent 5 years of data, 2011 to 2015. The 2016 updated baseline would be used to determine allocations for 2020 to 2025. If the unit had some operating data in 2011, it would receive minimal allowances in 2020 to 2025 based on the amount of electrical generation in 2011. The next unit update would occur in 2021 and would use 2015 to 2019 operating data. Since the unit would have no operating data for this time period it would no longer receive allocations. Under this procedure a unit that is retired in 2011 could receive allowances until 2025.

(e) Data used for energy generation baselines. In performing the unit energy output baseline calculations under pars.(a) to (d), the department shall use data reported by the CAIR designated representative to EPA under 40 CFR part 97, Subpart HH and available from the EPA and data reported by the CAIR renewable representative to the department under s. NR 432.07. If the required data is unavailable from the EPA, the department shall request the required data directly from the unit's CAIR designated representative. If the representative does not provide data within 30 days of the department's request, the department shall estimate the unit's baseline energy output using best available data.
(1m) STATE BASELINE.
(a) Prior to 2011, the department shall establish the state baseline by summing the unit baselines calculated according to sub.(1) for all CAIR NOx units listed in Table 1.
(b) In 2011 and annually thereafter, the department shall calculate an annual state baseline by summing the unit baselines calculated according to sub.(1) for all CAIR NOx units and all CAIR renewable units.

Note: The state baseline is updated starting in 2011 annually to incorporate new units that have 5 years of operating data and have established a baseline under s. NR 432.03(a) and (b). Once a new unit has established a baseline, it is eligible for allowances from the main allocation pool.

(2) ALLOWANCE ALLOCATION FOR UNITS WITH 5 OR MORE YEARS OF OPERATION DATA.
(a) In 2007, and in 2011 and annually thereafter, the department shall allocate to all CAIR NOx units and CAIR renewable units for which a unit baseline has been calculated under sub. (1), a total amount of CAIR NOx allowances equal to 93% of the tons of NOx emissions in the trading budget for Wisconsin in 40 CFR 97.140.
(b) The department shall allocate CAIR NOx allowances to each unit in an amount determined by equation 3:

See PDF for diagram

where:

Ai is the annual allocation of CAIR NOx allowances for unit i rounded to the nearest whole ton, adjusted by the department as needed to ensure that the sum of the allowances to all units does not exceed 93% of the trading budget in 40 CFR 97.140

MAP is the main allocation pool of CAIR NOx allowances in tons which is the trading budget for Wisconsin in 40 CFR 97.140, minus the new unit set-aside established in sub. (3)

Bi is the unit baseline established under sub. (1) for unit i

Bs is the state baseline as determined under sub. (1m)

(3) ALLOCATIONS FOR UNITS WITH LESS THAN 5 YEARS OF OPERATING DATA. In 2009 and annually thereafter, the department shall allocate CAIR NOx allowances to CAIR NOx units for which a request is received under par. (b) and that commenced operation on or after January 1, 2001 and for which a baseline energy output cannot be determined under sub. (1), in accordance with the following procedures:
(a) For 2009 and each year thereafter, the department shall establish a new unit set-aside consisting of all CAIR NOx allowances available for new units in that year. The new unit set-aside in each year shall be equal to 7% of the amount of tons of NOx emissions in the trading budget under 40 CFR 97.140 for Wisconsin.
(b) The CAIR designated representative of a CAIR NOx unit that commenced operation on or after January 1, 2001, may submit to the department a request to be allocated CAIR NOx allowances under this subsection, starting with 2009 or the first calendar year after the calendar year in which the CAIR NOx unit commences commercial operation, whichever is later, and until the first calendar year for which the unit is eligible for and is allocated CAIR NOx allowances under sub. (2). The CAIR NOx allocation request shall be submitted on or before May 1 of the calendar year for which the CAIR NOx allowances are requested and after the date on which the CAIR NOx unit commences commercial operation.
(c) In a CAIR NOx annual allocation request under par. (b), the CAIR designated representative may not request CAIR NOx allowances exceeding the CAIR NOx unit's total tons of NOx emissions during the calendar year immediately before the calendar year of the request.
(d) The department shall review each CAIR NOx annual allocation request submitted under par. (b) and allocate CAIR NOx allowances for each calendar year as follows:
1. The department shall establish the maximum amount of new unit set-aside CAIR NOx allowances a unit is eligible for based upon a request submitted under par. (b).
2. Before June 1 of each calendar year, the department shall determine the sum of all CAIR NOx allowances established under subd.1. for all new units in the calendar year.
3. If the amount of CAIR NOx allowances in the new unit set-aside for the calendar year under par. (a) is greater than or equal to the sum determined under subd. 2., the department shall allocate the amount of CAIR NOx allowances determined under subd.1. to each CAIR NOx unit for which an allocation request was submitted.
4. If the amount of the CAIR NOx allowances in the new unit set-aside for the calendar year under par. (a) is less than the sum determined under subd. 2., the department shall allocate to each CAIR NOx unit for which the department established a maximum amount under subd.1. greater than zero, an amount determined using equation 4:

See PDF for diagram

where:

Ni is the annual allocation of CAIR NOx set-aside allowances for new unit i for the calendar year rounded to the nearest whole ton, adjusted by the department as needed to ensure that the sum of the allowances to all units does not exceed 7% of the trading budget in 40 CFR 97.140

Ri is the amount of CAIR NOx allowances the department determined unit i is eligible for under subd. 1.

NUSA is the new unit set-aside established under par. (a)

k is the number of units for which the department established an amount greater than 0 under subd. 1.

(e) The department shall notify each CAIR designated representative that submitted an allocation request under par. (b) of the amount of CAIR NOx allowances allocated for the calendar year to the CAIR NOx unit covered by the request.
(4) ALLOCATION OF REMAINING NEW UNIT SET-ASIDE ALLOWANCES. After completion of the procedures under sub. (3), any CAIR NOx allowances remaining in the new unit set-aside for the calendar year shall be allocated to the CAIR NOx units and CAIR renewable units that were allocated CAIR NOx allowances under sub. (2) for the calendar year in an amount determined using equation 5:

See PDF for diagram

where:

Xi is the allocation of remaining CAIR NOx new unit set-aside annual allowances for unit i rounded to the nearest whole ton, adjusted by the department as needed to ensure that the sum of the allowances to all units does not exceed the amount of U

U is the amount of unallocated CAIR NOx new unit set-aside allowances in tons

Ai is the annual allocation of CAIR NOx allowances for unit i calculated using equation 3

MAP is the main allocation pool of CAIR NOx allowances in tons which is the trading budget for Wisconsin in 40 CFR 97.140 minus the new unit set-aside established in sub. (3)

(5) CAIR NOx allocations for 2009 to 2014. The CAIR NOx allocations for 2009 to 2014 for individual CAIR NOx units are listed in Table 1

Table 1

CAIR NO x Allocations for 2009 to 2014 by CAIR NO x Unit

(in tons of CAIR NO x allowances)

Unit Location

Unit Number

2009

2010

2011

2012

2013

2014

Alma

4

222

222

222

222

222

222

Alma

5

314

314

314

314

314

314

Bayfront

1

77

77

77

77

77

77

Bayfront

2

79

79

79

79

79

79

Bayfront

5

128

128

128

128

128

128

Blackhawk

3

9

9

9

9

9

9

Blackhawk

4

8

8

8

8

8

8

Blount Generating Station

3

5

5

5

5

5

5

Blount Generating Station

5

7

7

7

7

7

7

Blount Generating Station

6

9

9

9

9

9

9

Blount Generating Station

7

71

71

71

71

71

71

Blount Generating Station

8

167

167

167

167

167

167

Blount Generating Station

9

192

192

192

192

192

192

Blount Generating Station

11

2

2

2

2

2

2

Columbia

1

3035

3035

3035

3035

3035

3035

Columbia

2

2920

2920

2920

2920

2920

2920

Concord

1

12

12

12

12

12

12

Concord

2

14

14

14

14

14

14

Concord

3

11

11

11

11

11

11

Concord

4

10

10

10

10

10

10

Custer Energy Center

1

0

0

0

0

0

0

De Pere

ALL

123

123

123

123

123

123

Edgewater

3

335

335

335

335

335

335

Edgewater

4

1563

1563

1563

1563

1563

1563

Edgewater

5

2118

2118

2118

2118

2118

2118

Fitchburg

1

4

4

4

4

4

4

Fitchburg

2

4

4

4

4

4

4

French Island

3

4

4

4

4

4

4

French Island

4

4

4

4

4

4

4

Genoa

1

1778

1778

1778

1778

1778

1778

Germantown

30, 31

4

4

4

4

4

4

Germantown

32, 33

3

3

3

3

3

3

Germantown

34, 35

5

5

5

5

5

5

Germantown

36, 37

4

4

4

4

4

4

Germantown

38

24

24

24

24

24

24

Madgett

1

1884

1884

1884

1884

1884

1884

Manitowoc

6

139

139

139

139

139

139

Manitowoc

7

139

139

139

139

139

139

Manitowoc

8

139

139

139

139

139

139

Mirant/ Neenah

1

100

100

100

100

100

100

Mirant/ Neenah

2

100

100

100

100

100

100

Nelson Dewey

1

513

513

513

513

513

513

Nelson Dewey

2

506

506

506

506

506

506

Paris

1

17

17

17

17

17

17

Paris

2

21

21

21

21

21

21

Paris

3

22

22

22

22

22

22

Paris

4

15

15

15

15

15

15

Pleasant Prairie

20

3498

3498

3498

3498

3498

3498

Pleasant Prairie

21

3548

3548

3548

3548

3548

3548

Port Washington

1

218

218

218

218

218

218

Port Washington

2

190

190

190

190

190

190

Port Washington

3

221

221

221

221

221

221

Port Washington

4

219

219

219

219

219

219

Pulliam

3

100

100

100

100

100

100

Pulliam

4

122

122

122

122

122

122

Pulliam

5

265

265

265

265

265

265

Pulliam

6

376

376

376

376

376

376

Pulliam

7

466

466

466

466

466

466

Pulliam

8

759

759

759

759

759

759

Rock River

1

115

115

115

115

115

115

Rock River

2

95

95

95

95

95

95

Rock River

3

0

0

0

0

0

0

Rock River

5

14

14

14

14

14

14

Rock River

6

20

20

20

20

20

20

Sheepskin

1

1

1

1

1

1

1

Sheepskin

2

0

0

0

0

0

0

South Fond du Lac

1

29

29

29

29

29

29

South Fond du Lac

2

24

24

24

24

24

24

South Fond du Lac

3

18

18

18

18

18

18

South Fond du Lac

4

14

14

14

14

14

14

South Oak Creek

25

1163

1163

1163

1163

1163

1163

South Oak Creek

26

1189

1189

1189

1189

1189

1189

South Oak Creek

27

1604

1604

1604

1604

1604

1604

South Oak Creek

28

1617

1617

1617

1617

1617

1617

Stoneman

B1

17

17

17

17

17

17

Stoneman

B2

19

19

19

19

19

19

Valley Boiler 1

21

376

376

376

376

376

376

Valley Boiler 2

22

376

376

376

376

376

376

Valley Boiler 3

23

376

376

376

376

376

376

Valley Boiler 4

24

376

376

376

376

376

376

West Marinette

31

12

12

12

12

12

12

West Marinette

32

9

9

9

9

9

9

West Marinette

33

76

76

76

76

76

76

West Marinette

34

47

47

47

47

47

47

Weston

1

321

321

321

321

321

321

Weston

2

531

531

531

531

531

531

Weston

3

2000

2000

2000

2000

2000

2000

Weston

32

39

39

39

39

39

39

Wheaton

1

13

13

13

13

13

13

Wheaton

2

12

12

12

12

12

12

Wheaton

3

13

13

13

13

13

13

Wheaton

4

9

9

9

9

9

9

Wheaton

5

3

3

3

3

3

3

Wheaton

6

3

3

3

3

3

3

Whitewater Cogen Facility

CTG1

375

375

375

375

375

375

Whitewater Cogen Facility

STG1

157

157

157

157

157

157

Wis. Admin. Code Department of Natural Resources NR 432.03

CR 06-104: cr. Register July 2007 No. 619, eff. 8-1-07.