Notwithstanding the provisions of s. NR 406.04(1) and (2), a construction permit is required for each of the following:
Wis. Admin. Code Department of Natural Resources NR 406.035
Reopening of a plant-wide applicability limitation to accommodate an increase of the plant-wide applicability limitation is accomplished using the procedures in s. NR 405.18(8) (b) 1. c. and (11) (a) 3. or 408.11 (8) (b) 1. c. and (11) (a) 3. Reopening of a plant-wide applicability limitation to accommodate a decrease of the plant-wide applicability limitation is accomplished using the procedures in s. NR 406.11(1m).