Current through October 28, 2024
Section NR 405.12 - Source information(1) The owner or operator of a proposed major source or major modification shall submit all information necessary to perform any analysis or make any determination required under procedures established in accordance with this chapter.(2) Such information shall include:(a) A description of the nature, location, design capacity, and typical operating schedule of the major source or major modification, including specifications and drawings showing its design and plant layout.(b) A detailed schedule for construction of the major source or major modification.(c) A detailed description as to what system of continuous emission reduction is planned by the major source or major modification, emission estimates, and any other information as necessary to determine that best available control technology as applicable would be applied.(3) The owner or operator shall also provide information on all of the following: (a) The air quality impact of the major source or major modification, including meteorological and topographical data necessary to estimate such impact.(b) The air quality impacts and the nature and extent of any or all general, commercial, residential, industrial and other growth which has occurred since August 7, 1977, in the area the major source or major modification would affect.Wis. Admin. Code Department of Natural Resources NR 405.12
Cr. Register, January, 1987, No. 373, eff. 2-1-87; am. (3) (intro.), Register, December, 1996, No. 492, eff. 1-1-97.