W. Va. Code R. § 65-19-8

Current through Register Vol. XLI, No. 50, December 13, 2024
Section 65-19-8 - Time periods
8.1 Where a time period is provided for in this rule, the period is intended to be a maximum period. In the event a given requirement is completed sooner than the stated period by the Authority, a hospital or an interested party, then the next time period, if any, begins to elapse upon the actual date the requirement is completed.
8.2. Calculation of time periods - Whenever in this rule the date by which some action is directed to be taken or accomplished falls on a Saturday, Sunday or a state holiday, then the time for taking or accomplishing the action is extended to the next day which is not a Saturday, Sunday or a state holiday.

W. Va. Code R. § 65-19-8