W. Va. Code R. § 64-92-4

Current through Register Vol. XLI, No. 50, December 13, 2024
Section 64-92-4 - Licensed Contractor Duties
4.1. Licensed clandestine drug laboratory remediation contractors shall:
4.1.1. Ensure that each of the contractor's employees or agents who will be involved with a clandestine drug laboratory remediation project is properly licensed;
4.1.2. Not begin a clandestine drug laboratory remediation project until a preliminary remediation plan is submitted to and a notice to proceed is issued by the department;
4.1.3. Ensure that all work practices are in compliance with this rule, applicable OSHA requirements and all other applicable local, state, and federal requirements;
4.1.4. Use waste-disposal dumpsters, disposal sites, and methods which are in conformance with applicable federal, state, and local laws, rules, and regulations;
4.1.5. Have third-party final clearance sampling performed upon completion of remediation project;
4.1.6. Submit a final remediation report for each remediation project to the department within 10 days of receipt of final third-party analytical test results;
4.1.7. Supervise demolition of residential properties by licensed and certified contractors; and
4.1.8. Submit all analytical test results to the commissioner.

W. Va. Code R. § 64-92-4