Current through Register Vol. XLI, No. 50, December 13, 2024
Section 61-4B-5 - Frozen Dessert Manufacturer Permit5.1. The commissioner shall issue a 'frozen desserts manufacturer permit' to each manufacturer of frozen desserts or imitation frozen desserts. Permits shall be issued for each place of operation and are not transferable with respect to persons or locations. The permit may be applied to the operation of several freezers at one location. Each freezer will be registered with the commissioner on forms provided and will inform the commissioner of the addition or removal of freezer(s) from a place of operation. Each mobile unit shall be considered as operating at one location.5.2. Individuals, churches, fraternal organizations, and other groups or organizations manufacturing product for members of their group or their guests on an intermittent and infrequent basis are exempt from the permitting requirements of W. Va. Code §19-11B- 3.5.3. A manufacturer shall apply on forms supplied by the commissioner and provide any information considered necessary by the commissioner. A manufacturer shall apply for the permit at least fifteen days before the date that the current permit expires or within fifteen days of the date that the person intends to engage in business. A fee set by Appendix 1, Schedule of Fees shall accompany the application. An additional fee of $2 shall be charged when a permit is not sought or renewed within the above-stated time Resample fee(s) and fines must be paid with the registration fee(s) before a permit will be issued. All fees will be collected at the start of the renewal period or at a time or interval otherwise determined by the commissioner. All fees may be paid before the renewal period if such pre-renewal period payments are approved by the commissioner. Permits will expire on March 31st of each year and must be renewed annually.5.4. The manufacturer shall place the permit prominently at the place of operation.