Current through Register Vol. XLI, No. 50, December 13, 2024
Section 60-13-3 - Overview3.1. The agency recognizes the benefits of using the design-build delivery method for environmental projects. Design-build allows for increased efficiency, reduced costs, and greater collaboration between the design and construction teams.3.2. The agency/owner will be responsible for providing a clear delineation of environmental needs/goals. The agency will use a two-phase selection process for design-build projects is a procurement method that involves two distinct phases of Best Value evaluation for selecting the design-build team for a construction project. This process helps to ensure that the project is delivered with the highest quality, efficiency, and cost-effectiveness.