Current through Register Vol. XLI, No. 50, December 13, 2024
Section 54-5-12 - General Conditions and Requirements12.1. The proposed project shall be designed to affect a significant and measurable reduction in the solid waste stream.12.2. If applicable, all grant proposals shall include an analysis and projection of materials that will be diverted from the solid waste currently being landfilled and the costs and/or savings that will directly result from the proposed project.12.3. If applicable, project proposals shall include a plan to identify markets able to handle the projected volumes of materials to be collected and demonstrate the cost effectiveness and self-sufficiency of the proposed project.12.4. Grant recipients may request a revision to their grant budget only after approval by the Solid Waste Authority's Board and only if it does not materially alter the original grant proposal approved by the Board.12.5. Grant recipients will include in their final report an analysis of the project including any or all of the following when it applies: total volume (tons) of waste diverted from the solid waste stream, the estimated cost per ton to recycle that volume, the estimated revenue per ton of recycled material, and the estimated savings from recycling in lieu of landfilling.