W. Va. Code R. agency 47, tit. 47, ser. 47-62, app B

Current through Register Vol. XLI, No. 50, December 13, 2024
Appendix B

INTERIM INSPECTION CHECKLIST

for INITIAL AST INSPECTION

1. AST Design (determination that the AST continues to meet design standards)

2. AST Construction and Installation - including but not limited to:

* Determination of proper foundation

* Compatibility of AST system with material stored

3. General Maintenance and Testing of AST system - Examination of the tank system exterior surfaces for:

* Flaws

* Areas of wear

* Corrosion

* Distortions

* Deterioration

* Any other conditions that might adversely affect structural integrity such as results of a leak test, internal inspection, or other tank integrity examination such that a determination on the suitability of the tank for continued use can be clearly established.

4. Corrosion Protection and Maintenance (existing and past corrosion protection) - Provide assessment of the following, as applicable:

* Galvanic and/or Impressed Current Systems

* External Coatings

* Internal Coatings or liners

5. Release Detection Method and Procedures

6. Release Prevention Methods and Procedures

7. Secondary Containment Structures (including the following):

* Capacity requirements (including sufficient freeboard for precipitation events)

* Compatibility requirements

* Soundness/Integrity

8. Record Keeping:

* Leak Detection System

* Corrosion Protection system

* General Operation and Maintenance (including upgrades and repairs to AST system)

W. Va. Code R. agency 47, tit. 47, ser. 47-62, app B