Current through Register Vol. XLI, No. 50, December 13, 2024
Section 47-34-5 - Application Procedures5.1. Application Preparation and Submission.5.1.a. Applications for a certificate of approval shall be prepared by or under the direct supervision of an engineer.5.1.b. Applications shall be submitted on the forms provided by the Secretary. Application forms must be completed in their entirety without unauthorized omissions, alterations, or additions. Applications shall be signed by the applicant and an engineer.5.1.c. A complete application will consist of a completed and signed application form, all applicable fees, and a plan package containing the information required under subsection 6.4.5.1.d. Plans, reports, specifications, and design drawings shall be signed and sealed by an engineer in accordance with the provisions of subsection 6.2.5.2. Application Review. 5.2.a. Applications will be reviewed for sufficiency by the Dam Safety Section. The review will consider the completeness and technical accuracy of the information submitted and will evaluate all engineering plans and assumptions to determine the safety of the dam.5.2.b. Applications which are incomplete or otherwise not in compliance with the requirements of this rule will be returned to the applicant for correction in accordance with the provisions of W. Va. Code § 22-14-7.