2.1. Injection into existing Class I, II, and III wells shall be authorized by rule for periods up to five (5) years from April 10, 1983, All such wells must have been issued permits within the five (5) year period or closed down, at its end, unless the rule is continued under Section 2.2 of these regulations.
2.2. Rules under Section 2,1 of these regulations authorizing Class II and"III wells or projects in existing fields or projects shall allow them to continue normal operations permitted, including construction, operation, and plugging and abandonment of wells Provided the owner or operator maintains compliance with all applicable requirements under the Board's Series nine (9).
2.3. Injection into Class V wells shall be authorized for a period of five (5) years until August 18, 1994, subject to the requirements of Section 13,2(b) and (d) of Section 12,00 of the Board's Series 9. However, the Chief has authority to withdraw the authorization if required under Section 13.2 of said regulations.
2.4. Any facility which is authorized by rule pursuant to these regulations shall meet the requirements contained in Section 13.2(b) of the Board's Series 9, no later than one (1) year after authorization by such rules,
2.5. These regulations do not supersede Series 9, and are solely intended as procedural regulations for the implementation of the provisions of Section 13.2 of the Board's Series 9, and in the event of any inconsistency or conflict between any provision of these regulations and any provision of Series 9, the provisions of Series 9 shall control.