Current through Register Vol. XLI, No. 50, December 13, 2024
Section 45-19-15 - Public Review Procedures15.1. At the time that an application for a construction or modification is filed, the applicant shall also place a Class I legal advertisement in a newspaper of general circulation in the area where the source is or will be located. No such permit shall be issued to any applicant until at least thirty (30) days notice has been provided to the public. The advertisement shall contain at a minimum, the name of the applicant, the type and location of the source, the type and amount of air pollutants that will be discharged, the nature of the permit being sought, the proposed start-up date for the source and a contact telephone number for more information.15.2. The Secretary shall make available in at least one location in the region in which the proposed source would be constructed a copy of all materials the applicant submitted (excluding data entitled to protection as confidential information under the Code and any rules pursuant thereto), a copy of the preliminary determination, and a copy or summary of other materials, if any, considered in making the preliminary determination.15.3. The Secretary shall place a Class I legal advertisement in a paper of general circulation in the area where the proposed source would be constructed, modified, or relocated. The advertisement shall contain, as a minimum, the name of the applicant, the type and location of the source, the proposed start-up date, the preliminary determination, notification of the opportunity for written public comment, provisions for requesting a public meeting, details concerning the time and place of such a meeting if one has already been scheduled, and notification of the opportunity for comment at a public meeting if such meeting is to be conducted. A public comment period of thirty (30) days shall be provided and so stated in the advertisement.15.4. The Secretary shall send a copy of the advertisement to the applicant, to USEPA, and to officials and agencies having cognizance over the location where the proposed construction would occur as follows: any other State or local air pollution control agencies, the chief executives of the city and county where the source would be located; any comprehensive regional land use planning agency, any State, and any Federal Land Manager, whose lands may be affected by emissions from the source or modification.15.5. Public comments submitted within thirty (30) days after the Secretary's public notification of an opportunity for comment upon a proposed construction or relocation of a major stationary source or major modification and comments submitted within a specified period not to exceed fifteen (15) days after any public meeting to receive comment on such proposed construction, modification, or relocation shall be considered by the Secretary before making a final decision on the approvability of the application. The Secretary shall make copies of all comments available for public inspection in the same locations where the Secretary made available pre construction information relating to the proposed source or modification.15.6. The Secretary shall make a final determination whether construction shall be approved, approved with conditions, or disapproved.15.7. The Secretary shall notify the applicant in writing of the final determination and make a copy of such notification available for public inspection at the same location where the Secretary made available pre construction information and public comments relating to the proposed source or modification.W. Va. Code R. § 45-19-15