Current through Register Vol. XLI, No. 50, December 13, 2024
Section 45-14-17 - Public Review Procedures17.1. At the time that an application for a construction, modification or relocation permit is filed, the applicant shall place a Class I legal advertisement in a newspaper of general circulation in the area where the source will be located. No permit shall be issued to any applicant until at least thirty (30) days' notice has been provided to the public. The advertisement shall contain at a minimum, the name of the applicant, the type and location of the source, the type and amount of air pollutants proposed to be discharged, the nature of the permit being sought, the proposed start-up date for the source, and a contact telephone number for more information.17.2. After finishing the review of a complete application, the Secretary shall make a preliminary determination whether a permit should be approved, approved with conditions, or disapproved.17.3. The Secretary shall make available in at least one location in the region in which the proposed source would be constructed a copy of all materials the applicant submitted (excluding data entitled to protection as confidential information under 45CSR31), a copy of the preliminary determination, and a copy or summary of other materials, if any, considered in making the preliminary determination.17.4. The Secretary shall place a Class I legal advertisement in a paper of general circulation in the area where the proposed source would be constructed, modified, or relocated. The advertisement shall contain, as a minimum, the name of the applicant, the type and location of the source, the proposed start-up date, the preliminary determination, the degree of increment consumption that is expected from the source or modification, notification of the opportunity for written public comment, provisions for requesting a public meeting, details concerning the time and place of such a meeting if one is scheduled, and notification of the opportunity for comment at a public meeting, if such meeting is to be conducted. A public comment period of thirty (30) days shall be provided and so stated in the advertisement.17.5. The Secretary shall send a copy of the advertisement to the applicant, to the Administrator, and to officials and agencies having cognizance over the location where the proposed construction would occur as follows: any other State or local air pollution control agencies, the chief executives of the city and county where the source would be located; any comprehensive regional land use planning agency, any State and Federal Land Managers whose lands may be affected by emissions from the source or modification.17.6. The Secretary shall consider public comments submitted within the thirty (30) day comment period and comments submitted within a specified period not to exceed fifteen (15) days after any public meeting held to receive comments before making a final decision on the approvability of the application. The Secretary shall make copies of all comments available for public inspection in the same locations where the Secretary made available preconstruction information relating to the proposed source or modification.17.7. The Secretary shall make a final determination whether construction should be approved, approved with conditions, or disapproved.17.8. The Secretary shall notify the applicant in writing of the final determination and make a copy of such notification available for public inspection at the same location where the Secretary made available preconstruction information and public comments relating to the proposed source or modification.W. Va. Code R. § 45-14-17