Current through Register Vol. XLI, No. 50, December 13, 2024
Section 42-10-9 - Unscheduled Cessation of Operation9.1. Following any unscheduled cessation of operation, the operator of a zipline or canopy tour shall immediately have the participants safely removed or unloaded from the zipline or canopy tour.9.2. If the operator determines that the zipline or canopy tour can safely resume operation, the qualified person shall first operate the zipline or canopy tour without participants to ensure that the cause of the unscheduled cessation of operation has been corrected.9.3. The operator shall document any unscheduled cessation of operation, including the identification of the zipline or canopy tour, the name of the employee operating the zipline or canopy tour during the unscheduled cessation, and a complete description of the incident, including the date, time, weather conditions, location, number of participants, etc.