Current through Register Vol. XLI, No. 50, December 13, 2024
Section 42-3-5 - Application for a Permit to Install a High-Pressure Steam Boiler; Issuance of a Permit to Install a High-Pressure Steam Boiler or Forced Flow Steam Generator5.1. Prior to the installation of a high-pressure steam boiler or forced flow steam generator in West Virginia, the owner or operator shall submit an application for a permit to install at least 15 days before the intended date of installation and shall provide all information as the Commissioner may require on a form supplied by the Division.5.2. If, upon review by the Commissioner, the application is complete and contains the required information, he or she shall issue a permit to install the high-pressure steam boiler or forced flow steam generator. 5.3. If, upon review by the Commissioner, the application is incomplete, the Division shall notify the applicant and specify what information is still needed before a permit to install can be issued.