1.1. Scope. -This rule establishes the requirements for an application for a permit to install a high-pressure steam boiler or a forced flow steam generator, the issuance of permits to operate a high-pressure steam boiler or a forced flow steam generator, the inspection of high-pressure steam boilers and forced flow steam generators, fees for inspections of and the issuance of permits for high-pressure steam boilers and forced flow steam generators, the certification of inspectors and special inspectors, and grounds for the revocation of a permit to operate a high-pressure steam boiler or a forced flow steam generator.1.2. Authority. -W. Va. Code § 21-3-7. 1.3. Filing Date. -April 27,2021 1.4. Effective Date. -June 9, 2021 1.5. Sunset Date. This rule shall terminate and have no further force or effect upon June 9, 2031.