Current through Register Vol. XLI, No. 50, December 13, 2024
Section 38-4-32 - Monitoring Plans32.1. Owners of Class C dams shall formulate and submit a monitoring plan to the Secretary for approval. Owners of Class A and Class B dams may be required by the Secretary to formulate and submit a monitoring plan for approval.32.2. The monitoring plan developed by the dam owner must follow the format of the example plan provided by the Secretary and shall include, but not limited is the following: 32.2.a. A description of the dam, including appropriate drawings and location maps;32.2.b. A listing of problems and deficiencies and any implemented repairs;32.2.c. The inspection frequency under varying weather conditions;32.2.d. A description of areas or items to be inspected; Corrective actions to be taken;32.2.e. The responsible person's name's addresses and telephone numbers;32.2.f. The method of notification of the Secretary and county emergency services authorities;32.2.g. Other items required by the Secretary based upon site specific conditions.32.3. Monitoring plans shall be updated annually. More frequent updating of the plans may be required by the Secretary based upon rapidly changing personnel or site conditions. The monitoring plan shall be implemented immediately by the dam owner upon the approval of the plan by the Secretary.