W. Va. Code R. § 38-4-26

Current through Register Vol. XLI, No. 50, December 13, 2024
Section 38-4-26 - Inspection, Reporting and Certification Requirements
26.1. Inspection during construction:
26.1.a. Plans, specifications and all inspection reports shall be available at the construction site office for reference by construction personnel and the representatives of the Secretary.
26.1.b. A visual inspection for construction progress, determination of unstable conditions, conformance plans, and quality control shall be done on a regular basis and at least once each working day. The inspection shall be done by a registered engineer or a person under the direct supervision of the registered engineer. Inspections shall be done after heavy rainfall events to determine problems and remedial measures.
26.1.c. Instrumentation shall be monitored once in every seven days unless otherwise specified in approved plans. Monitoring of instrumentation shall be done by approved persons. The frequency of monitoring may be changed by the Secretary upon specific project area conditions.

W. Va. Code R. § 38-4-26