W. Va. Code R. § 36-10-19

Current through Register Vol. XLI, No. 50, December 13, 2024
Section 36-10-19 - Evaluation and Revision of Roof Control Plan
19.1. Revisions of the roof control plan shall be proposed by the operator:
19.1.1. When conditions indicate that the plan is not suitable for controlling the roof, face, ribs, or coal or rock bursts; or
19.1.2. When accident and injury experience at the mine indicates the plan is inadequate. The accident and injury experience at each mine shall be reviewed at least every six (6) months.
19.2. Each unplanned roof fall and rib fall and coal or rock burst that occurs in the active workings shall be plotted on a mine map if it:
19.2.1. Is above the anchorage zone where roof bolts are used;
19.2.2. Impairs ventilation;
19.2.3. Impedes passage of persons;
19.2.4. Causes miners to be withdrawn from the area affected; or
19.2.5. Disrupts regular mining activities for more than one (1) hour.
19.3. The mine map of which roof falls are plotted shall be available at the mine site for inspection by authorized representatives of the Director and representatives of miners at the mine.
19.4. The roof control plan for each mine shall be reviewed every six (6) months by an authorized representative of the Director. This review shall take into consideration any falls of the roof, face, and ribs and the adequacy of the support systems used at the time.