Browse as ListSearch Within- Section 35-8-1 - General
- Section 35-8-2 - Definitions
- Section 35-8-3 - Forms
- Section 35-8-4 - Violations, Findings, and Orders
- Section 35-8-5 - Permits, Notice, Review
- Section 35-8-6 - Plats; Form and Contents
- Section 35-8-7 - Notice to Coal Owner, Operator or Lessee; Objections to Applications by Coal Owner, Operator or Lessee; Notice of Objection
- Section 35-8-8 - Separate Bonds; Blanket Bonds; Financial Responsibility; Registration; Designation of Agent; Transfer of Title and Operator Status; Transfer Procedures; Ineffective Bonds; and Financial Responsibility from Competing Interests
- Section 35-8-9 - Operational Criteria
- Section 35-8-10 - Well Records
- Section 35-8-11 - Reports
- Section 35-8-12 - Reclamation; Notification; Production and Gathering Pipelines; and Operating in Designated Mining Areas
- Section 35-8-13 - Preventing Waste
- Section 35-8-14 - Variances
- Section 35-8-15 - Water Supply Testing
- Section 35-8-16 - Construction of Pits and Freshwater Impoundments with Capacity of Greater Than Five Thousand (5,000) Barrels Included in a Specific Well Work Permit
- Section 35-8-17 - Construction of Centralized Pits and Impoundments with Capacity of Greater Than Five Thousand (5,000) Barrels
- Section 35-8-18 - Spill and Pollution Prevention and Control Measures; Drilling, Completion, Work-over, and Production Operations
- Section 35-8-19 - Plugging, Abandonment, and Reclamation
- Section 35-8-20 - Plugging Methods
- Appendix A - Plugging Methods