BASE GROUND FLOOR AREA AND ADDITIONS ADDITIONS
1s FR - One Story Frame FOH - Frame Overhang
1s BR - One Story Brick MP - Masonry (Concrete Patio)
1s STN - One Story Stone CNPY - Canopy
1s CB - One Story Concrete WD DK - Wood (Sun) Deck
1s Stucco - One Story Stucco F Bay - Frame Bay
1 1/2s FR - One and One Half B Bay - Brick Bay
Story Frame
2s BR - Two Story Brick S Bay - Stone Bay
2 1/2s BR - Two and One Half Stucco Bay - Stucco Bay
Story Brick
3s FR - Three Story Frame MS - Masonry Stoop
MT - Masonry Terrace
OFP - Open Frame Porch
Notes: Symbols used to label OBP - Open Brick Porch multi-level additions are to be OMP - Open Masonry
Porch stacked, i.e. ... EFP - Enclosed Frame
Porch
1s FR - A Frame Addition over
2c BG 2 Car Brick Garage EBP - Enclosed Brick
Porch
EMP - Enclosed Masonry
Porch
OFP -A Two Story Open Frame FG - Frame Garage
OFP - with a Basement BG - Brick Garage
B STNG - Stone Garage
CBG - Concrete Block
Garage
Be sure that if the areas of STUCCO G - Stucco Garage various levels are different, CP - Carport make certain that the proper B - Basement corresponding areas are A - Attic discernible.
All garages are to be prefixed by the car capacity, i.e., 1cBG...2cFG. etc.
W. Va. Code R. § 189-2-6