Current through Register Vol. XLI, No. 50, December 13, 2024
Section 186-3-8 - Specification Changes8.1. Specifications cited in the statewide contract may be revised when needed to keep current with industry changes and government needs.8.2. When a spending unit is changing the design or construction of a commodity on the statewide contract, the Committee and CNA shall be notified of the contemplated change prior to the effective date. A reasonable time shall be given to qualified vendors in which to redesign or retool and incorporate the change.