Wash. Admin. Code § 51-54A-3103

Current through Register Vol. 24-23, December 1, 2024
Section 51-54A-3103 - Temporary tents and membrane structures

3103.5 Use period. Temporary tents, air-supported, air-inflated or tensioned membrane structures are permitted to be erected for a period of less than 180 days within a 12-month period on a single premises. Such structures erected for 180 days or more within a 12-month period shall comply with the IBC.

Wash. Admin. Code § 51-54A-3103

Adopted by WSR 16-03-055, Filed 1/16/2016, effective 7/1/2016