Current through Register Vol. 24-23, December 1, 2024
Section 51-54A-0105 - Permits105.5.14.1Lithium batteries. An operational permit is required for an accumulation of more than 15 cubic feet (0.42 m) of lithium-ion and lithium metal batteries, where required by Section 322.1. 105.5.32Mobile food preparation vehicles. A permit is required for mobile preparation vehicles equipped with appliances that produce smoke or grease-laden vapors or utilize LP-gas systems or CNG systems.105.6.25Underground supply piping for automatic sprinkler system. A construction permit is required for the installation of the portion of the underground water supply piping, public or private, supplying a water-based fire protection system. The permit shall apply to all underground piping and appurtenances downstream of the first control valve on the lateral piping or service line from the distribution main to 1 foot above finished floor of the facility with the fire protection system. Maintenance performed in accordance with this code is not considered to be a modification and does not require a permit. EXCEPTIONS: | 1. When the underground piping is installed by the aboveground piping contractor. 2. Underground piping that serves a fire protection system installed in accordance with NFPA 13D. |
Wash. Admin. Code § 51-54A-0105
Amended by WSR 16-03-055, Filed 1/16/2016, effective 7/1/2016Amended by WSR 17-10-028, Filed 4/25/2017, effective 5/26/2017Amended by WSR 19-24-058, Filed 11/27/2019, effective 7/1/2020Amended by WSR 21-04-003, Filed 1/20/2021, effective 2/20/2021Amended by WSR 22-13-093, Filed 6/14/2022, effective 7/1/2023Amended by WSR 23-23-106, Filed 11/15/2023, effective 3/16/2024Statutory Authority: RCW 19.27A.031, 19.27.074 and chapters 19.27 and 34.05 RCW. 13-04-063, § 51-54A-0105, filed 2/1/13, effective 7/1/13.