Current through Register Vol. 24-23, December 1, 2024
Section 480-70-096 - Certificates, acquisition of control(1)Notice required. Any person acquiring control of a solid waste collection company through acquisition of the stock of that company must notify the commission in writing within thirty days of the acquisition.(2)Content of notice. Notice may be accomplished by filing a letter with the commission. The letter must include at least the following information: (a) The name, registered trade names, and certificate number of the acquired company.(b) The date of acquisition.(c) The names of the majority stockholders and the percent of stock each holds.(d) The name, address, telephone number, telefacsimile number, and e-mail address of a contact person within the company to whom questions may be directed.(e) The location (mailing address and physical address) where books and records of the acquired company will be retained.Wash. Admin. Code § 480-70-096
Statutory Authority: RCW 81.04.160, 81.77.030 and 80.01.040. 01-08-012 (Docket No. TG-990161, General Order No. R-479), § 480-70-096, filed 3/23/01, effective 4/23/01.