Projects authorized by the board are divided into the following phases:
Wash. Admin. Code § 479-05-051
Statutory Authority: Chapter 47.26 RCW. 12-08-060, § 479-05-051, filed 4/3/12, effective 5/4/12; 07-18-050, § 479-05-051, filed 8/30/07, effective 9/30/07.