Wash. Admin. Code § 468-16-040

Current through Register Vol. 24-23, December 1, 2024
Section 468-16-040 - Criteria for a determination of an unsatisfactory record of performance

The following list of deficiencies may be considered cause for a determination that an unsatisfactory record of performance exists:

(1) Failure to complete project on time; or
(2) Continued workmanship below the level of standard; or
(3) Failure to adhere to the plans and specifications; or
(4) Disregard for the welfare or safety of traveling public; or
(5) Inadequate supervision and control of subcontractors; or
(6) Insufficient supervision available on project site; or
(7) Inadequate coordination and planning with owner; or
(8) Inadequate procurement and delivery of supplies and materials; or
(9) Inadequate control and utilization of equipment; or
(10) An overall performance rating in the prime contractor performance report of less than standard as defined in WAC 468-16-030 and 468-16-150.