Any registered voter may appeal to the superior court of Thurston County to review the contents of the ballot title or the summary of the final cost-effectiveness study on a major public energy project bond measure up to ten days following the filing of such document with the secretary of state. Such appeals shall be conducted in the same manner as appeals of ballot titles on initiatives as provided in RCW 29A.72.080.
Wash. Admin. Code § 434-291-070
Statutory Authority: RCW 29A.04.610. 04-15-089, § 434-291-070, filed 7/16/04, effective 8/16/04. 98-08-010, recodified as § 434-291-070, filed 3/18/98, effective 3/18/98. Statutory Authority: RCW 29.04.080 and 29.81.070. 82-12-022 (Order 82-1), § 434-91-070, filed 5/25/82.