Wash. Admin. Code § 392-346-050

Current through Register Vol. 24-23, December 1, 2024
Section 392-346-050 - Site review and evaluation

The superintendent of public instruction together with the proposing district(s) shall conduct an on-site review and evaluation of sites for new and existing state funding assistance projects. In selecting sites, the district(s) should assure that:

(1) The property upon which the facility is or will be located is free and clear of all encumbrances that would detrimentally interfere with the construction and operation or useful life of the facility.
(2) The site is of sufficient size to meet the needs of the facility.
(3) A geotechnical engineer has conducted a limited subsurface investigation to gather basic information regarding potential foundation and subgrade performance.
(4) The site accessibility is convenient and efficient for participating and contract school districts with the least amount of disturbance to the area in which it is located.
(5) The site topography is conducive to desired site development.
(6) A site review or predesign conference has been conducted with all local code agencies in order to determine design constraints.

Wash. Admin. Code § 392-346-050

Statutory Authority: RCW 28A.525.020. 10-09-040, § 392-346-050, filed 4/14/10, effective 5/15/10; 06-16-031, recodified as § 392-346-050, filed 7/25/06, effective 8/25/06; 98-19-145, § 180-32-050, filed 9/23/98, effective 10/24/98. Statutory Authority: RCW 28A.47.830. 83-21-070 (Order 15-83), § 180-32-050, filed 10/17/83.