Wash. Admin. Code § 392-343-500

Current through Register Vol. 24-23, December 1, 2024
Section 392-343-500 - State funding assistance - Priorities after June 30, 1992

The priority system for the funding of school construction projects after June 30, 1992, shall be as follows: For all new construction and modernization projects for school districts, there will be a unique priority score determined by the elements and formulas contained in WAC 392-343-505 through 392-343-520. The total score shall be used to rank all projects that have secured local funding and state board of education approval after January 26, 1991, or the superintendent of public instruction approval after June 6, 2006, and are otherwise eligible for state funding assistance. The elements are divided into three groups:

(1) Common elements;
(2) New construction for growth elements; and
(3) Modernization or new-in-lieu of modernization elements.

In the case of a combined project (i.e., new construction for growth and modernization), the respective scores in each group will be prorated on the basis of each group's related gross square footage in the total project.

Wash. Admin. Code § 392-343-500

Statutory Authority: RCW 28A.525.020. 10-09-008, § 392-343-500, filed 4/8/10, effective 5/9/10; 06-16-032, amended and recodified as § 392-343-500, filed 7/25/06, effective 8/25/06; 98-19-143, § 180-27-500, filed 9/23/98, effective 10/24/98. Statutory Authority: RCW 28A.525.020 and 1992 c 233 § 24(8). 92-16-058, § 180-27-500, filed 8/3/92, effective 9/3/92.