Wash. Admin. Code § 392-341-025

Current through Register Vol. 24-23, December 1, 2024
Section 392-341-025 - State study and survey-Content

The study and survey to be conducted by the superintendent of public instruction with the cooperation of the local school district shall include the following:

(1) An inventory and area analysis of existing school facilities within the district, a description of the types and kinds of systems and subsystems used in those facilities and their physical condition;
(2) A long-range (i.e., minimum of six years) educational and facilities plan setting forth the projected facility needs and priorities of the district based on the educational plan, including a discussion of the need for adjustments of school attendance areas within the district, and supplemented by the following information:
(a) Demographic data including population projections and projected economic growth and development. OSPI shall provide projected enrollment based on most recent October enrollments. District shall provide most recent October enrollments of developmentally disabled students;
(b) The ability of such district to provide capital funds by local effort;
(c) The existence of a school housing emergency as defined by RCW 28A.525.166(5)(a);
(d) The need to improve racial balance and/or to avoid creation or aggravation of racial imbalance: OSPI shall provide diversity report based on most recent October enrollments and enrollment data reported by district;
(e) The type and extent of new and/or additions to existing school facilities required and the urgency of need for such facilities;
(f) A cost/benefit analysis on the need to modernize and/or replace existing school facilities in order to meet current educational needs and the current state building code;
(g) A determination of the district's time line for completion of the school facilities project (s); and
(3) Such other matters as the superintendent of public instruction deems pertinent to decision making in the allocation of funds for school facilities, or that the applicant district deems relevant. Cooperation by the applicant school district in conducting the study and survey is a requisite for the superintendent of public instruction to complete the study and survey and to establish the eligibility of the district for state funding assistance in school facility construction.

Wash. Admin. Code § 392-341-025

Amended by WSR 21-13-129, Filed 6/22/2021, effective 7/23/2021

Statutory Authority: RCW 28A.525.020. 10-09-008, § 392-341-025, filed 4/8/10, effective 5/9/10; 06-16-032, amended and recodified as § 392-341-025, filed 7/25/06, effective 8/25/06; 98-19-139, § 180-25-025, filed 9/23/98, effective 10/24/98. Statutory Authority: [RCW 28A.525.020.] 91-12-058, § 180-25-025, filed 6/5/91, effective 7/6/91. Statutory Authority: RCW 28A.47.803, 28A.47.060, 28A.47.802 and 28A.47.105. 90-04-031, § 180-25-025, filed 1/30/90, effective 3/2/90. Statutory Authority: RCW 28A.47.830. 85-24-047 (Order 24-85), § 180-25-025, filed 11/27/85; 83-21-064 (Order 9-83), § 180-25-025, filed 10/17/83.