The applicant for a coal option contract shall submit a plan of activities which shall include but is not limited to the following:
(1) The type, location, and schedule of exploratory drilling and trenching activities;(2) Location of other significant activities, including type and depth of drilling, trenching, and adit construction;(4) Reclamation, including method of plugging and sealing drill holes and adits;(5) Proposed erosion control plans for roads, landings, drilling platforms, and trenches; and(6) Proximity to surface water including proposed stream crossings. If the holder of a coal option contract desires changes to the approved plan of activities, department approval is required.
Wash. Admin. Code § 332-14-170
Statutory Authority: RCW 79.01.668. 85-10-040 (Order 443), § 332-14-170, filed 4/29/85.