Wash. Admin. Code § 296-800-31080

Current through Register Vol. 24-23, December 1, 2024
Section 296-800-31080 - Test the employee alarm system
(1) You must test the reliability and adequacy of your employee alarm system every two months.

Use a different activation device in each test of a multiactuation device system, so the entire alarm system gets tested.

(2) You must make sure that supervised (monitored) employee alarm systems are tested at least once a year for reliability and adequacy.

Wash. Admin. Code § 296-800-31080

Amended by WSR 18-22-116, Filed 11/6/2018, effective 12/7/2018

Statutory Authority: RCW 49.17.010, [49.17].040, and[49.17].050 . 01-11-038, § 296-800-31080, filed 5/9/01, effective 9/1/01.